Batch changeover schedule
Estimate machine time for equal lots with a reset between successive lots.
Your inputs
Check each input. Use a number within its allowed range and step.
Reserve machine time for both production and changeovers.
How much machine time do the batches and changeovers require? View the worked example.
How this is calculated
Multiply lots by lot size and seconds per part, then convert to minutes. Add one changeover for each boundary between lots. The machine starts ready for the first lot.
Put Batch changeover schedule on your own site.
One business can set its own starting values, name and enquiry email. Get the standalone HTML file from your private receipt after PayPal confirms payment. Save the receipt link before paying.
Buy and download · €29Prefer email delivery? Pay €29 with PayPal for manual delivery. JB Codex verifies payment and emails your file to the checkout email.