Benchcraft
← All buyer questions

Makers & production

How much machine time do the batches and changeovers require?

Multiply lots by lot size and seconds per part, then convert to minutes. Add one changeover for each boundary between lots. The machine starts ready for the first lot.

Use the free calculator Get the business edition · €29

Worked example

With the example inputs below, the calculator returns these results.

Parts scheduled 60

Lots to make
3 lots
Parts in each lot
20 parts
Run time per part
45 s
Changeover between lots
15 min

Other results

Time producing parts
45 min
Time in changeovers
30 min
Total machine time
75 min

Use your own figures

Reserve machine time for both production and changeovers. Open the worksheet, replace the example values, then copy or print the result.

Batch changeover schedule →