How much machine time do the batches and changeovers require?
Multiply lots by lot size and seconds per part, then convert to minutes. Add one changeover for each boundary between lots. The machine starts ready for the first lot.
Use the free calculator Get the business edition · €29
Worked example
With the example inputs below, the calculator returns these results.
Parts scheduled 60
- Lots to make
- 3 lots
- Parts in each lot
- 20 parts
- Run time per part
- 45 s
- Changeover between lots
- 15 min
Other results
- Time producing parts
- 45 min
- Time in changeovers
- 30 min
- Total machine time
- 75 min