Two-station line capacity
Compare the hourly capacity of two successive stations with parallel workers at each.
Your inputs
Check each input. Use a number within its allowed range and step.
Find the rate that sets the pace of the line and the ideal output per shift.
Which of our two production stations limits hourly output? View the worked example.
How this is calculated
Each worker completes 3,600 divided by cycle seconds parts per hour. Workers at the same station operate in parallel. The slower station rate governs the line. Shift output assumes steady flow for the entire net production time.
Put Two-station line capacity on your own site.
One business can set its own starting values, name and enquiry email. Get the standalone HTML file from your private receipt after PayPal confirms payment. Save the receipt link before paying.
Buy and download · €29Prefer email delivery? Pay €29 with PayPal for manual delivery. JB Codex verifies payment and emails your file to the checkout email.