Benchcraft
← All buyer questions

Events & hospitality

How many check-in lanes do I need at peak arrival time?

Divide expected service seconds by interval seconds times target utilisation and round up to whole desks. The capacity and load use average throughput across all desks. This staffing estimate assumes a flowing queue and comparable service times. It does not predict individual waits.

Use the free calculator Get the business edition · €29

Worked example

With the example inputs below, the calculator returns these results.

Staffed lanes needed 6

Arrivals during peak interval
240 guests
Peak interval length
30 min
Average time per check-in
35 s
Target desk utilisation
80 %

Other results

Planned arrivals at target load
246
Average load across these lanes
77.78%

Use your own figures

Balance forecast arrivals against service time and your target desk utilisation. Open the worksheet, replace the example values, then copy or print the result.

Check-in lane staffing →