Will the animation finish rendering overnight?

Round duration times frame rate up to whole frames. Each machine handles one frame at a time. Round frames divided by machines up to whole batches, then multiply by frame time. Negative time remaining indicates an overrun. Queue and transfer delays are excluded.

Use the free calculator Get the business edition · €29

Worked example

With the example inputs below, the calculator returns these results.

Frames to render 1,000

Animation duration
40 s
Output frame rate
25 frames/s
Average render time per frame
45 s
Identical render machines
4 machines
Available render window
3 hours

Other results

Elapsed render time
187.5 min
Window remaining
-7.5 min

Use your own figures

Allow for the final partially filled batch of frames. Open the worksheet, replace the example values, then copy or print the result.