Will the animation finish rendering overnight?
Round duration times frame rate up to whole frames. Each machine handles one frame at a time. Round frames divided by machines up to whole batches, then multiply by frame time. Negative time remaining indicates an overrun. Queue and transfer delays are excluded.
Use the free calculator Get the business edition · €29
Worked example
With the example inputs below, the calculator returns these results.
Frames to render 1,000
- Animation duration
- 40 s
- Output frame rate
- 25 frames/s
- Average render time per frame
- 45 s
- Identical render machines
- 4 machines
- Available render window
- 3 hours
Other results
- Elapsed render time
- 187.5 min
- Window remaining
- -7.5 min
Use your own figures
Allow for the final partially filled batch of frames. Open the worksheet, replace the example values, then copy or print the result.
Animation render window →